Construction + Repowering = 808 MW.
Construction:
- Pecem Thermoelectric Power Plant: Capacity 720 MW, of which 50% (360 MW) equals the share by EDP Brasil.
- Tramandaí / RS wind farm: Capacity 70 MW, of which 48% (32 MW) equals the share by EDP Brasil.
Repowering:
Mascarenhas 18 MW.
Click on the symbols (
) on the map to learn more about the small hydroelectric plants.

To find the plants, select its respective State in the map above, or find it in the list below.
State
Plant
